M&S – 50 Stores
Project Title: M&S 50 Stores
Client: Marks & Spencer
Main Contractor: Eco-1
Eco-1 Role: Electrical Contractor
Duration: 40 Weeks
Project Value: £1.9m
Sector: Retail
Brief description of Works
Eco-1 Electrical Solutions was selected as the main contractor to lead the lighting upgrade project for multiple stores across the M&S estate, including high street, retail park, and outlet stores. This project involved retrofitting and replacing outdated lighting with energy-efficient LED alternatives, ensuring a sustainable, cost-effective solution for M&S locations nationwide.
- Retrofitting and replacing existing lighting fixtures with LED alternatives in various retail environments across the M&S estate.
- Installation, commissioning, and testing of all new lighting fittings to ensure optimal performance.
- Alteration of the lighting control scheme, to improve energy efficiency and enhance store management capabilities
- Store layout and specific lighting requirements for different retail environments.
- Ensuring compatibility with existing control systems, making the retrofit process as seamless as possible.
- Designing solutions that balanced energy savings, aesthetic appeal, and functional lighting performance.
- Reduced energy consumption and lower operating costs across the estate.
- Enhanced store ambiance with brighter, more focused lighting that improves product visibility and customer experience.
- A future-proof lighting system, designed to be easily maintained and upgraded as technology advances.
Health & Safety Commitment
Health and safety are integral to everything we do. We prioritise safety through dedicated resources, an in-house team, and expert consultancy. Our multiple SSIP accreditations, including Constructionline Gold, CHAS, Safe Contractor, and Altius, highlight our commitment to the highest safety standards.











